Projects:

Kings Yard & Stratford City Energy Centres

Kings Yard Energy Centre Kings Yard Artist Impression Cooling Tower Construction at Stratford
Previous
Please click the arrows to navigate the images
Next

For more information on what we can do for you
please call us on 01695 50123 or contact us here

Project Category: Steelwork Projects

Client: Elyo East London Energy Limted

Main Contractor: P J Carey

Architect: John McAslan & Partners

Engineer: Adams Kara Taylor (AKT)

Steel weight (tonnes): 1000

Construction Type: New Build

Market Sector: 2 x New Biomass Energy Centres


TAAG Steelwork are currently working on two new energy centres which will provide environmentally friendly power and heat for the East End of London.


The sites are located at Kings Yard and Stratford City, and each provide their own unique challenges.


Kings Yard
The site, located in the old Kings Yard Industrial Buildings, requires a brand new build to be blended to existing listing buildings.


The build will see the construction of a 45 meter flue tower, which as well as being functional, is designed to be a striking part of the local skyline.

Stratford Energy Centre
Due to tight scheduling timeframes work on the site will continue 7 days a week for a 5 week period, when the building will be handed over for the next stage of construction.


Meticulous planning before construction began, which included shutting down local Railway Links due to the proximity of nearby Railway Lines and the Channel Tunnel link, ensures that the project continues on schedule and with minimal disruption to local services.

  
The energy centre will provide lighting and heating for the new Stratford City Retail Development.
In total these installations comprise of over 1000 tonnes of Steelwork with 2000 metres of edge protection and 7000m2 of PCC Units.


The innovative methods used in the Energy Centres will have environmental and economic benefits. The biomass technologies will create energy which will reduce carbon emissions (the main greenhouse gas). The Energy Centres will reduce carbon emissions by 20 per cent - 5,000 tonnes per year.

Top

Are you a construction supplier?

If you would like to become a supplier to The AA Group, please contact us or call us:

T:01695 50123

TAAG Sustainability Policy

Find out about the TAAG Sustainability Policy

Safety Health & Environment

Download our Health & Safety statement in PDF format

TAAG Environmental Statement

Download our Environmental statement in PDF format